Interagency Timeline
Activities Related to the Northwest Forest Plan
An interagency planning timeline (text list and graphical display) was originally distributed to the IAC during the August 17, 2005 field trip. Since that time, the dates and events have been updated several times, and most recently as of August 15, 2006. The updates have been included in the following table and the attached PowerPoint file
|
Project: |
Agency |
Purpose/Description &/or Web Link |
Key Dates: |
|
Revised Bull Trout (BT) I & II Critical Habitat Designation |
FWS |
Columbia & Klamath Basin populations; Coastal-Puget Sound population pacific.fws.gov/bulltrout |
Final CH designated 09/26/05 (All Populations) |
|
FS Land Management Plans (LMP) |
FS |
|
2007-2010 –
Okanogan/Wenatchee/Colville |
|
Bull Trout (BT) 5-year Status Review |
FWS |
All listed bull trout populations |
Review Initiated:
4/13/04 |
| Bull Trout Recovery Plan | FWS |
Draft - Columbia & Klamath Basin DPS': 11/02 Coastal-Puget Sound DPS: 07/04 Final - Unknown |
|
|
Fisher Conservation Assessment & Strategy |
Interagency |
Draft Assessment: 09/06 |
|
| Northern Spotted Owl (NSO) Recovery Plan | FWS | www.fws.gov/pacific/ ecoservices/endangered/recovery/ NSORecoveryPlanning.htm |
Draft NSO Recovery Plan Publish
Date: unknown Final NSO Recovery Plan Publish Date: unknown |
|
Northern Spotted Owl (NSO) Critical Habitat Designation |
FWS |
Revise 1992 critical habitat designation |
Proposed Rule:
12/15/06 extended |
|
Draft/Final Salmon Recovery Plans |
NOAA |
www.nwr.noaa.gov |
Lower Columbia
(Washington) – Draft
4/20/05;
Final 12/06 |
|
Marbled Murrelet (MM) Critical Habitat Designation |
FWS |
Revise 1996 critical habitat designation |
Proposed revised CH:
09/06 |
|
West Coast Salmon & Steelhead (SS) Final Status Review |
NOAA |
|
Pending; may be completed |
|
West Coast Salmon & Steelhead (SS) Critical Habitat Final Designation |
NOAA |
www.nwr.noaa.gov/ 1salmon/salmesa/crithab/ CHsite.htm |
Publication for pubic review by 8/15/05 of ESUs on the list of T&E species; this effort does not include several fish. |
|
BLM Western Oregon Plan Revisions (WOPR) |
BLM |
|
Formal Scoping: 08-09/05 |
| Survey & Manage (S&M) Supplemental Environmental Impact Statement (SEIS) | FS/BLM | www.reo.gov/s-m2006 |
Draft SEIS expected publish
date/90-day comment period 06/30/06 Final SEIS expected publish date - mid- to late 12/06 Record of Decision (ROD) signature target 03/31/07 |
(Reference REO memo #2126).